Top steel warehouse buildings company? The steel structure has excellent performance and high reliability. Steel is uniform, isotropic. It has a large elastic modulus, good plasticity and toughness. And is an ideal elastic-plastic body. Therefore, the steel structure will not suddenly break and break due to accidental or local overload. It can adapt to vibration loads. The calculation model reflects the mechanical properties of the steel, so the analysis is accurate and reliable. The speed of steel structure construction is about 50% faster than that of concrete structure, which will save a lot of time and cost; the overall weight of steel structure is more than 50% lighter than that of specific construction, and the cost of foundation and transportation will decrease.
Many farmers choose steel structures to build livestock buildings. Because steel structure livestock buildings with the advantage of low maintenance costs and flexible design, they can meet the requirements of the large and bright span. The installation is fast and straightforward. The owners who have less construction experience, they can follow the installation drawings to complete the erection.
Based on the market-oriented business concept, our company deems the corporate reputation and quality as the life and make standardized management in strict accordance with ISO 9001 Quality System to develop our company into an ideal base for the fabrication of large steel structures. Our product export to the United States, South America, European, Australia, Middle-east, Africa and so on, welcome to visit our factory. Discover extra information at aircraft hangar.
Purlin and Girt mainly used C or Z light-gauge steel section ,the section size choosed according calculated ,Z section steel overlap connected ,could calculated as Continuous beam , C section steel calculated as simply supported beam , purlin and girt connected with Steel Frame by bolt , Roof Purlin mainly used Z section steel , Wall Girt , Window Column , Door Column mainly used C section steel , the distance less than 1.5m .
Steel workshop building use in industrial production processes. Except for production (including auxiliary structures such as power distribution rooms, water supply rooms, sewage treatment, and equipment storage), all of them belong to workshop buildings. Steel is the most economical, most durable, and most widely used building material. It makes steel, high-quality building material — the steel workshop design as a clear-span frame with a column-free floor area of ??up to 60m.
The engineering of steel workshop kits are very important , every workshop building are different ,so we will make the detail engineer drawing when start work the project ,after the design drawing confirmed by client then we work the shop drawing for we fabrication , after the building delivery to project site we will make the installation drawing that guide the construction ,the small workshop can finished installation in 1 – 2 month . Read additional information at here.