Stone retaining wall construction company in Colorado: Ensure you order everything you need at once and set aside an allowance for breakages and cutting. Contrary to popular belief, building a fence on top or behind a Block Retaining wall is rather easy. In some cases where only a small amount of retaining is required as in 200-400mm, the fence can be built directly on top of the wall with the fence posts passing through the walling blocks and concreted into the ground as normal. This method would be ok to use with all forms of fencing such as post and rail, colour bond post and rail, good neighbour fencing, tubular panel and even pool fencing.
If you’re building tiered retaining walls, set each tier back far enough to prevent the weight and pressure of the wall above from destroying the one below it. The rule of thumb is to separate wall tiers by a distance that’s no less than twice the height of the wall below. So if the bottom wall is 4 feet tall, the wall above it should be built at least 8 feet behind it. Walls more than 4 feet tall will likely require a building permit and a plan made by a licensed engineer. The engineer will specify the base’s width and depth, how far down the base course should be buried, and whether or not a geogrid (soil reinforcement system) should be used.
A wall that leans into the soil it retains is less likely to be pushed outward by soil pressure than a plain-old vertical wall. Design and build your retaining wall to slope at a minimum rate of one inch for every one-foot of rise (height). Fortunately, working with retaining wall blocks makes it incredibly easy to achieve this “step-back” construction! The locking flange on the bottom edge of every block guides it to click into position slightly behind the lower block, preventing the top blocks from being pushed outward.
After mixing your concrete, pour the wall in horizontal layers of not more than 20 inches, beginning at the ends and moving toward the center. Use a ramp to wheel the concrete into position and a splashboard to direct the pour and control spillage. Remove the spacers as you go, and work the concrete against the sides of the form and around the reinforcement as each layer is poured. Pour layers as soon after the previous one as possible to avoid cold (non-bonded) joints, which cause leaks. Strike off the concrete flush with the top of the form, and then trowel it to the desired finish. Insert anchor bolts for mud sills and wooden caps once the concrete has set sufficiently to hold them. Because of the pressure created by the slope of the lawn, cure the concrete for at least seven days before removing the forms. See more details on Colorado Retaining Wall Builder.
We also repair existing retaining walls. Many railroad tie walls or older concrete retaining walls which may or may not include rocks or boulders are beginning to show signs of failure. Often times a homeowner will build a DIY retaining wall that needs help after years of service. Colorado Retaining Wall specializes in the building and repair of retaining walls. Whether the wall is for a backyard or driveway of a residence or a commercial Shopping Center, we design and build large block walls for all Earth retention requirements. We have the ability to fortify the wall with shotcrete or soil nails which would include helical tie-backs or micropiles. Nearly every wall we build requires engineering and we have deep relationships with engineers that work hand-in-hand with our foremen regardless of the size of project. Please read our reviews and look and our photo gallery.